This full-day practical hearing loop training course is designed to take you through the principles of assistive listening, from an overview of why these systems are needed and general theory on how they work, to installing, commissioning, and troubleshooting hearing loops to ensure a standards-compliant provision is in place.
We will be starting with the basics so regardless of your current level of knowledge, this course will provide you with a good understanding of everything needed to implement a suitable assistive listening solution in your next project.
Cost | $199/session – includes continental breakfast and lunch |
Presenter | Sam Burkinshaw from Ampetronic |
Class Size | Limited to 30 attendees |
Certification | This session is eligible for 8 AVIXA CTS RU |
|
|
Date | Thursday, October 13, 2022 |
Time | 8:30 am – 3:00 pm eastern |
Location | Holiday Inn Express Suites Woodside Queens, Woodside, NY (See map below for address) |
A second session is available on Tuesday, October 11, 2022 | 9:00 am – 3:30 pm eastern | Philadelphia Airport Marriott, Philadelphia, PA. Click the registration link to sign up for either class.
Introduction to Assistive Listening |
Hearing Loop Solutions |
Commissioning a Hearing Loop |
||
– The Purpose of Assistive Listening | – Floor Level Perimeter Loop | – Install and Commission Perimeter Loop | ||
– ADA Legal Requirements | – Large Perimeter Loop at Height | – Install and Commission Counter Loop | ||
– Applications for Assistive Listening | – Loss Control Single Array | – Install and Commission Low Spill MultiLoop | ||
– Assistive Listening Technology Comparison | – What is Metal Loss? | – Interpreting Designs | ||
– Audio Inputs | – Loss Control MultiLoop | – Metal Loss Testing | ||
– Understanding Hearing Loops | – What does a Phase Shift Do? | – Install Tips and Common Faults | ||
– Two Turn Perimeter Loop | – Cable Types, Feed Cables, and Signal Cables | |||
Performance Standards | – Cancellation Loop | |||
– What is Overspill? | Amplifier Types, Common Features & Connections | |||
Test Equipment | – Low Spill MultiLoops | |||
– Vertical Spill Control | ||||
– Ceiling Installation | ||||
– Non-Overlap MultiLoops | ||||
– Counter & Portable Loops | ||||
– Complex Designs |